Client: Omnetics Location: Minneapolis

This was a complete design build project that focused on creating a new manufacturing facility for Omnetics.

A world class connector design and manufacturing company located in Minneapolis; the project included creating a large manufacturing floor and two floors of office space. We installed LED lighting throughout and a utility separation of two existing 3,000 amp services. Additional distribution panels were installed to accommodate this expansion.

  • Matt Bright, Senior Project Manager
  • Chad Milosevich, Journeyman